A1000Schedule tools for people who build things

What’s driving
your finish date?

Driving Path is four schedule tools for construction. Build the CPM, present it, plan the next three weeks and run the monthly reports. They open the P6, Microsoft Project and Excel files you already have, right in the browser. Nothing is uploaded.

  • CPMbuild the logic
  • Viewerpresent and review
  • Lookahead Studioplan the field
  • Reportssend the monthly
Live schedule. This chart is calculated in your browser, not drawn. Stretch a bar and it reschedules.
Substantial completion
Tue May 11on baseline
Driving path
7 activities52 working days

The orange path sets the finish date. Everything in gray has float.

What if
Opens what you already have
  • .xerPrimavera P6
  • .xlsxP6 and plain Excel
  • .xmlMicrosoft Project
  • .csvanything with dates

A2000The tools

One schedule.
Four ways to work it.

The same fifteen activities, start to finish. Scroll, and watch them rearrange for whoever needs them next: the scheduler, the owner, the superintendent, the monthly report.

Riverbend WRF Phase 2 is a fictional sample project. Every tool opens on it.

01 Build

Driving Path CPM

Get the logic right.

A full critical path scheduler. Tie the work together, set baselines, and trace the driving path to any activity, not only to the finish. When something changes, run the delay through a time impact analysis and see what it costs.

  • Gantt, baselines and DCMA checks
  • Driving path tracing and time impact analysis
  • Reads and writes P6, Microsoft Project and Excel
Open CPM

02 Present

Driving Path Viewer

Make it readable.

Twelve view designs and ten palettes turn the same file into an executive timeline, a proposal sheet or a critical path spotlight. Mark it up, compare two updates, then print exactly what you see. It never edits the schedule.

  • 12 views × 10 palettes, or your brand colors
  • Comments that stay on their activities across updates
  • Vector PDF, PNG and SVG that match the preview
Open Viewer

03 Plan

Lookahead Studio

Hand it to the field.

Cut a two to twelve week window out of the schedule, break activities into the sub-items a foreman actually talks about, and group the work by WBS or by company. Print it for the Monday meeting.

  • Timeline, Calendar and Board layouts
  • Field sub-items under each activity
  • Print-ready PDF, PNG and Excel
Open Lookahead Studio

04 Report

Driving Path Reports

Send the monthly.

Twenty-one reports that start with what matters: summary tiles and key findings computed from the schedule. What drives the finish, what slipped, what to fix. Run one, or run the whole package.

  • DCMA 14-point health check
  • Update comparison, month over month
  • PDF, a combined report book, and Excel
Open Reports

A3000The monthly update

Ten reports.
One click.

The package an owner asks for every month, in the order they ask for it. Each report prints the way it previews, page breaks and all.

0.00seconds for the sample project

10 PDFs Report book.pdf Workbook.xlsx

And eleven more when you need them: schedule health check, update comparison, milestones, three-week lookahead, near-critical work, open ends, constraints, variance, and a custom report builder.

A4000Measured, not promised

5,096
activities on screen in about a second. Import and first render of a five-thousand-activity schedule in the Viewer. Scrolling and zooming stay smooth after that.
Viewer
21
reports, with findings written for you. Each one opens with what drives the finish, what slipped and what to fix, computed from the dates in your file.
Reports
2–12
weeks of lookahead, your choice. By WBS for the scheduler or by company for the meeting, with field sub-items under each activity.
Lookahead Studio
0
bytes uploaded. Every tool reads, calculates and prints inside your browser. Your schedule stays where it is.
All four

A5000Milestone

Open your schedule.

Each tool opens on the Riverbend sample project, so you can look around before you load anything of your own.